Brückenkrane

Overhead Bridge Crane outside a power plant
Overhead Bridge Crane outside a power plant
Overhead Bridge Crane outside a power plant
Downloads: 

Overhead Bridge Crane

Installation description
Overhead Bridge Crane outside a power plant.

Country
Czech Republic

City
Kadaň - Prunéřov

Representative office
Conductix-Wampfler s.r.o. [CZ]

Operator
ČEZ, a.s., Elektrárna Prunéřov

Technical requirement[s]
Main power supply for a Overhead Bridge Crane

System course
Linear

Travel distance [Load]
207 m [Program 0812, SinglePowerLine]
35 m [Program 0240, Festoon System]

Product[s]
• Conductor Rail, Program 0812, SinglePowerLine
• Festoon System, Program 0240

Quantity of poles
3+PE

Current
250 A

Voltage
400 V

Relevante Produkte

Single PowerLine 0813


Series 0240



  • Conductix-Wampfler AG
    Thörishaus

    Brunnmattstrasse 13
    CH-3174 Thörishaus
    Schweiz

    Telefon: +41 31 889 08 11
    Fax: +41 31 889 08 66

    vCard
    QR-Code
    So finden Sie uns